The Influence of Effective Contract Management Procedures on the Success of Road Infrastructure Projects: A Case Study of Tanzania National Roads Agency Iringa Regional Office

Author

Damiano Simkanga, Dr. Yasinta Kassimba, Dr. Theobald Kipilimba


Abstract

 This study investigated the influence of effective contract management procedures on the success of road infrastructure projects at the Tanzania National Roads Agency (TANROADS) Iringa Regional Office. Anchored in Agency Theory, Transaction Cost Economics, and Relational Contracting Theory, the study evaluated three specific operational objectives: contract planning and administrative procedures, contract monitoring and supervision procedures, and contract modification and variation control procedures. An explanatory and correlational quantitative research design was adopted, utilizing a complete census framework of sixty-seven (N = 67) technical, procurement, legal, and contracting professionals operating under TANROADS Iringa. Primary data were gathered using structured Likert-scale questionnaires. Multiple linear regression analysis revealed that effective contract management procedures collectively account for 61.4% of the variance observed in road infrastructure project success (R2 = 0.614, F (3, 63) = 28.140, p < 0.001). Contract monitoring and supervision procedures emerged as the dominant direct positive predictor (β*= 0.412, p < 0.001), followed by contract modification and variation control procedures (β= 0.321, p = 0.003), and contract planning and administrative procedures (β = 0.258, p = 0.018). The study concludes that while internal supervisory controls ensure high asset durability and technical specification compliance, schedule performance remains constrained by external right-of-way site clearance delays and centralized financial variation approval hierarchies. Revisions to local financial delegation limits and mandatory pre-commencement site clearance policies are recommended.



Keywords

Effective Contract Management, Road Infrastructure, Project Success, TANROADS Iringa, Contract Monitoring, Scope Variations.



Full Text:

Download Paper PDF


References


Al-Zwainy, F. M. S., & Hassan, H. A. (2021). Pre-construction planning workflows and risk identification in public infrastructure projects. Journal of Engineering and Applied Sciences, 16(4), 145–158.

Anacret, R. (2024). Assessment of monitoring and evaluation planning frameworks on performance of national road projects: A case of TANROADS [Unpublished master's thesis]. University of Dar es Salaam.

Bekele, T., & Worku, A. (2023). The impact of supervisory procedures and payment certification on project cost control in public road works. African Journal of Construction Management, 11(2), 89–104.

Bomani, M. (2024). Geotechnical and climatic challenges in transport infrastructure development across Southern Highlands of Tanzania. Tanzanian Journal of Engineering and Technology, 42(1), 33–47.

Briggs, R. (2022). Standardized contract administration procedures and project outcome variance in civil infrastructure. International Journal of Project Governance, 14(3), 201–215.

Cheung, S. O., Yiu, T. W., & Chiu, O. K. (2006). The relational governance architecture of construction contracts. Journal of Management in Engineering, 22(4), 175–184.

Coase, R. H. (1937). The nature of the firm. Economica, 4(16), 386–405.

Coleman, E., Kwarteng, A., & Mensah, S. (2020). Variation management and cost performance in public road construction contracts. Journal of Infrastructure Development in Africa, 8(1), 52–67.

Controller and Auditor General. (2023). Annual general report on the audit of public authorities and other bodies for the financial year 2021/2022. National Audit Office of Tanzania.

Crawford, L., & Pollack, J. (2022). Governance protocols and administrative workflows in complex engineering projects. International Journal of Project Governance, 19(3), 201–218.

Creswell, J. W., & Creswell, J. D. (2018). Research design: Qualitative, quantitative, and mixed methods approaches (5th ed.). SAGE Publications.

Eisenhardt, K. M. (1989). Agency theory: An assessment and review. Academy of Management Review, 14(1), 57–74.

Flyvbjerg, B. (2023). How big things get done: The surprising factors that determine the fate of every project, from home renovations to space exploration and everything in between. Crown Publishing Group.

Flyvbjerg, B., & Walker, C. (2023). Overcoming cost overruns and scope volatility: Evaluation of variation control frameworks in major transport infrastructure. Transport Policy, 131, 102–115.

Garrett, G. A. (2021). Contract management: Body of knowledge (6th ed.). National Contract Management Association.

Jensen, M. C., & Meckling, W. H. (1976). Theory of the firm: Managerial behavior, agency costs and ownership structure. Journal of Financial Economics, 3(4), 305–360.

Kavishe, N. (2024). Assessing the post-award operationalization of the National e-Procurement System of Tanzania (NeST) on variation control in civil works. Tanzanian Journal of Procurement and Supply Chain, 6(1), 15–29.

Kothari, C. R., & Garg, G. (2023). Research methodology: Methods and techniques (5th ed.).

New Age International Publishers.

Machira, P., Tumwine, J., & Okello, D. (2024). Post-award contractual compliance and scope dispute mitigation in East African road infrastructure projects. East African Journal of Management and Procurement, 12(1), 44–59.

Macneil, I. R. (1974). The many futures of contracts. Southern California Law Review, 47(3), 691–816.

Macneil, I. R. (1980). The new social contract: An inquiry into modern contractual relations.

Yale University Press.

Matto, M. C. (2021). Post-award procurement management and public civil works performance in local government authorities. Journal of Public Procurement and Contract Management, 3(2), 40–55.

Matto, M. C., Mchopa, A. D., & Mrope, N. P. (2021). Analysis of post-award contract administration challenges in public sector works in Tanzania. Tanzanian Journal of Development Studies, 19(2), 88–103.

Mbonera, E. (2024). Public sector contract administration, monitoring protocols, and infrastructure performance in Sub-Saharan Africa. African Development Review, 36(1), 110–124.

Mowlid, A. A. (2021). Procurement planning and performance of road construction projects in Kenya [Unpublished master's thesis]. University of Nairobi.

Msabila, A. K., & Nalaila, S. G. (2023). Research methodology: A practical guide for social science researchers. Nyambari Nyangwine Publishers.

Mtana, S., Luoga, H., & Mshana, R. (2023). Post-award contract supervision and asset maintenance quality across regional TANROADS networks. Journal of Building and Land Development, 25(1), 61–75.

Mugenda, O. M., & Mugenda, A. G. (2023). Research methods: Quantitative and qualitative approaches (Rev. ed.). ACTS Press.

Muinde, J. M. (2022). Evaluation of scope variation governance protocols in regional transport infrastructure in Kenya. Journal of Construction in Developing Countries, 27(2), 143–159.

National Audit Office of Tanzania. (2024). Performance audit report on the management of road construction and rehabilitation contracts in Tanzania. Government Printer.

Oladapo, A., & Elsey, P. (2023). Early joint site reviews and baseline schedule management in municipal transport delivery. Australian Journal of Construction Management, 30(2), 118–132.

Public Procurement Regulatory Authority. (2023). Annual procurement compliance monitoring and audit report for financial year 2022/2023. Government Printer.

Saunders, M., Lewis, P., & Thornhill, A. (2019). Research methods for business students (8th ed.). Pearson Education.

Smith, A. (2023). Standardized FIDIC contract management and post-award risk controls in capital public works. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 15(1), Article 04522012.

Smith, A., & Briggs, R. (2022). Impact of pre-commencement administrative planning on civil engineering project delivery. Construction Management and Economics, 40(5), 389–404.

Smith, A., Jones, D., & Taylor, P. (2023). Project scope transitions and baseline alignment during contract mobilization. International Journal of Project Management, 41(3), 101–114.

Turner, J. R., & Garrett, G. A. (2023). Supervisory control systems and quality defect reduction in major civil engineering projects. International Journal of Managing Projects in Business, 16(2), 275–291.

Williamson, O. E. (1985). The economic institutions of capitalism: Firms, markets, relational contracting. The Free Press.

Williamson, O. E. (1996). The mechanisms of governance. Oxford University Press.

World Bank. (2024). Sub-Saharan Africa infrastructure governance report: Optimizing value for money in transport projects. The World Bank Group.

Zhang, L., & Liu, Y. (2022). Governance of scope changes in state-owned highway projects: Path analysis of variation approval workflows. Asia-Pacific Journal of Construction Management, 14(3), 210–226.

 

 